From creating custom patterns, to molding, machining then finally lining and coating, we do it all in house. Utilizing our in-house pattern shop, we can create custom patterns for any job. Metalfit operates four induction furnaces and four casting & molding lines, a full machine shop, and a linings and coatings department all on site. For a full explanation of our processes, please view our U.S. Pipe overview video.
This line is a Semi-automatic molding line, using:
For the waterworks industry, the green sand line is used to produce smaller fittings & castings, including
Currently, this is the most popular range of sizes, which subsequently directly relates to typically longer lead times than other sizes.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!
This line is a Semi-automatic, flask less molding line, with molds that can vary in size up to 60”x 60”x 29”, to produce castings up to 1400 lbs.
For the waterworks industry, the No-Bake line is used to produce mid-sized fittings & castings, including
This is the mid-size range size fittings, with lower demand, therefore typically faster lead times.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!
This line is a manual molding line in the floor, using the no bake system and flasks up to 110”x 110”x 36”, to produce castings up to 5000 lbs.
For the waterworks industry, the floor mold line is used to produce the largest fittings & castings, including
30” to 48” Flanged & MJ Fittings
These are the largest size fittings, with lower demand, therefore typically faster lead times.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!